 |
 |
 |
|
|
|
|
 |
 |
|
 |
Complete
renovation of 100K SF research facility, originally designed
as a biology / microbiology research center - mechanical,
electrical and plumbing design. |
|
 |
The
researchers wished to conduct empirical chemistry research,
which required advanced mechanical, electrical and plumbing,
air-handling, water, and laboratory vacuum systems. |
|
 |
During
renovation the physical layout of the building had to be carefully
considered to accommodate the code mandates for chemical control
zones and the Coastal Commission. |
|
 |
The
client was able to maintain full operations during the renovation
by very specific sequencing and constant communication among
all team members. |
|
 |
|
|
| |
|
|
|
  |
|
|
|
|
|
|
|
|
|
|
|