23,000 sq ft pharmaceutical manufacturing facility (design-build).
The project included clean rooms, packaging and storage space and an emergency power system to allow for the completion of the current product drug batch in the event of a utility outage.
This fast-track project took 5 months, from design through construction, to complete.
Aradigm works with pharmaceutical companies to develop drugs or biologics helping them maximize the effectiveness, safety and patient acceptance of molecules.