Veterans Administration Long Beach Hospital, Emergency Management Generator, Long Beach, CA

A Critical Generator Expansion

Design/build MEP engineering for the design of a new 12KV, 7.5MW engine generator, and additional modifications. The project consists of (2) 2500kW diesel generator sets with provision for a third 2500kW in the future, the generator building, an underground medium voltage line to tie to existing main switchgear, modifications to the main switchgear to accommodate the new feeder, and revised transfer scheme.

 

Services
Integrated Services
Construction Cost
$7 million
Client
U.S. Army Corps of Engineers (USACE), Soltek Pacific Construction