Randall Lamb Association

Naval Base Coronado, Fitness Center P-705, Coronado, CA

Fitness Center Receives Rave Reviews

As part of the design-build team, Randall Lamb completed MEP engineering for the largest Fitness and Liberty Center in the Navy, which opened in 2015 after six years of planning, design and construction. The $43.9 million project scope included construction of a 2-story Fitness Center, a 1-story, 16,673 square foot Liberty Center, a 12,651 square foot outdoor Olympic size pool, two lighted softball fields and one lighted multipurpose/soccer field at Naval Base Coronado (NBC). The new liberty center provides sailors with multiple recreation opportunities including an electronic gaming room, movie theater, television lounges, computer lounge, and access to free Wi-Fi connectivity. The 89,502 square foot Fitness Center includes lobby/reception areas, fitness program spaces, a gymnasium with basketball/ volleyball courts, unit Physical Training (PT) group exercise rooms, parent-child area, and men’s/women’s locker/shower rooms. Support spaces include laundry, storage, restrooms, and administrative spaces.

  • Design Build Institute of America, Western Pacific Region, Award of Merit, 2016
  • Project Size
    89,502 sq ft
    Services
    Integrated Services
    Construction Cost
    $43.9 million
    Client
    RQ Construction
    Architect
    RQ Design
    LEED Status
    LEED Silver Certification