Marine Corps Air Station Miramar, P-184 Hangar 6 Modifications and Addition, San Diego, CA

Home to MV-22s

MEP design/build engineering to renovate an existing 65,000 sq ft hangar area and build a 40,000 sq ft extension/addition to accommodate 2 squadrons of MV-22 aircraft. The MEP improvements included installation of 4 new built-in cranes, replacing the MEP systems of the existing hangar and new MEP systems for the hanger addition.  The infrastructure included electrical power, lighting and signal systems, ventilation systems, compressed air, and installation of an additional Aqueous Foam Forming Fluid Fire (AFFF) suppression system.

Project Size
105,000 sq ft
Services
Integrated Services
Construction Cost
$22 million
Client
Soltek Pacific Construction
Architect
Architects Mosher Drew