 |
 |
 |
|
|
|
|
 |
 |
|
 |
The
extension of the San Diego Trolley will connect Mission Valley
and the East County along the Interstate 8 corridor. This
$450 million project includes a tunnel that passes under the
San Diego State University, an underground trolley station,
and a pedestrian bridge. |
|
 |
 |
Randall
Lamb is providing mechanical, electrical and plumbing design
services for the relocation of all existing underground and
overhead utilities to accommodate the new trolley tunnel and
trolley station. |
|
 |
 |
Determination
of size, quantity, and location of telephone, broadband fiber,
broadband coaxial cable, and CATV lines was necessary to assist
in the development of the utility corridor's size, location,
and crossings. |
|
 |
 |
Coordination
with Pacific Bell, Cox Communications, and Teleport Communications
Group/AT&T was also performed in order to develop telecommunications
construction phasing plans, construction drawings, and specifications
for temporary and permanent relocation of telecommunication
utility lines as well as connections to SDSU facilities. |
|
 |
|
|
  |
|
|
|
|
|