 |
 |
 |
|
|
|
|
 |
 |
|
 |
300,000
sq ft high school in the Poway Unified School District. |
|
 |
 |
The
school's design included an industrial technology lab, computer
labs, physics lab, library, administration offices, television
broadcast studio, multi-use gymnasium, auditorium, food service,
concession stands, maintenance facility, tennis courts, parking
lots, roadways, pathways, and sports fields. |
|
 |
 |
Green
design practices resulted in a facility with dramatically
reduced cooling power consumption and utility bills. |
|
 |
 |
In
the gymnasium, our lighting designers used an indirect lighting
scheme and received the International Illumination Design
Award (IIDA). |
|
 |
|
|
  |
|
|
|
|
|
|
|
|
|
|
|